Sunday, October 19, 2008

Post #13: Trench for Electricity

With NYSEG approval in place we'll run the electric from a pole above the "old" studio. Matt and Jerry finished up this 2 foot trench. They kept hitting shale at exactly 2 feet. Pshew, at least we have SOME topsoil.



Trench at the end of the afternoon.